Wakefield-Woburn 345kV Transmission Line

Wakefield-Woburn 345kV Transmission Line

Services Provided

Transmission Ductbank & Vault System Installation – Trenching & Backfill

Location

Wakefield, MA

Client

National Grid

Owner

National Grid

United Civil was the Prime Contractor in the Woburn to Wakefield 345kV Cable Project. A National Grid and Eversource cooperative effort, this section of XLPE ductbank course 4-miles from National Grid’s Wakefield Junction Substation in Wakefield to an Eversource interface point in Woburn, MA.

Challenging work zones vary from live substation and right-of-way to densely populated residential streets and bustling business districts. Also, both sides of the MBTA commuter rail and The Mill River.

Unique features include one uninterrupted pipejacking (Jack and Bore) operations; installation of HOBAS glass-fiber-reinforced casing beneath The Mill River, and a welded stainless-steel casing under active railroad tracks; both with significant dewatering filtration requirements