Loading

HPE Facility Foundation Piling Cathodic Protection System Rehabilitation Project

This anode installation project included the concrete demolition in four areas inside the live plant building, consisting of sixty-four 10”x 25’ deep cores for Cathodic Protection. Vacuum and trench excavation was used throughout the work area to connect anodes cable. Excess soil not used for backfill required proper hazardous disposal.

  • Location

    Everett, MA