The project involved the demolition of an existing concrete encased steam line, manholes, and a retaining wall, excavation and backfill trenches for a new steam line as well as concrete equipment pads inside the boiler building. United Civil worked within a very tight schedule to complete the work on time.
Chestnut Hill, MA