We completed the civil and concrete scope for this project to replace the existing outdoor 23kV substation equipment with a new breaker and half Metal Clad Switchgear Power Center (MCSPC) and installation of two metal clad capacitor banks at Melrose Substation 2. Our work included site prep and trench excavation throughout the live yard, installation of in ground cable trench as well as finish grading and paving. We also completed numerous architectural upgrades to the existing brick control building inclusive of masonry repairs, and new doors and windows.
Melrose, MA