As the prime contractor, Phase I of this project involved the expansion of an existing live substation yard including the construction of a new 800’ paved access driveway and a new concrete retaining wall system. A new control house was constructed and the proper removal of unsuitable soil found in the area was required.

Phase II involved working for McPhee Electric on the expansion of the existing busbar system with new foundations, Trenwa and drainage. The station remained energized throughout construction.

  • Location

    Readsboro, VT