This project was to construct a new 11,000-square feet truck fueling station within an existing LNG facility. Our scope included demolition of the existing truck station, installation of piping, pipe supports, foundations, CIP scale approach pad, precast spill trench, grounding system, rip rap culvert system, and 16,500-square feet of new roadway. The extensive water removal portion of the project involved trenching and backfilling 450 lf of underground conduits and encasing 45-feet of buried conduits in red dyed concrete. Finish work included installation of bollards, guardrail, precast trench drain, precast concrete curbing and two pipe support foundations.
Howell, NJ